浅谈医院氧气系统提升改造
作者:
作者单位:

复旦大学附属华山医院 后勤保障部,上海 200000

作者简介:

通讯作者:

魏晓阳, E-mail: wei_xiaoyang@126.com

中图分类号:

R197.3

基金项目:


A brief discussion on upgrade and renovation of medical oxygen systems
Author:
Affiliation:

Logistics Support Department, Fudan University Huashan Hosipital, ShangHai 200000, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    目的 该文主要讨论了院区氧气系统的改造,旨在提高氧气供应的稳定性和安全性,减少对医院运营的影响,确保医疗安全。方法 通过计算,确定了急诊和呼吸科病房的氧气需求,分别为113.64 m3/h和85.695 m3/h。基于这些数据,提出了具体的改造方案,包括增加分汽缸、更换管道和新增管道维修阀等措施。文章还详细描述了改造步骤,并提出了在施工过程中与使用科室沟通、多部门协调和制定应急预案等注意事项。结果 改造方案有效地解决了氧气系统压力不足的问题,特别是在急诊和呼吸科病房区域,确保了氧气供应的稳定性和安全性。结论 在氧气系统规划设计时,应考虑更多影响因素和极端使用情况,以确保系统的长期可靠运行。文章强调了与相关科室的沟通、多部门协调和应急预案制定的重要性,确保改造过程顺利进行,并最大限度地减少对医院运营的影响。

    Abstract:

    Objective To discuss the renovation of the oxygen system in a hospital, with the aim of improving the stability and safety of the oxygen supply, minimizing the impact on hospital operations, and ensuring medical safety.Methods The oxygen demand was calculated, determining that the emergency and respiratory wards required 113.64 m3/h and 85.695 m3/h of oxygen, respectively. Based on these data, specific renovation plans were proposed, including the addition of gas cylinders, replacement of pipelines, and installation of new pipeline maintenance valves. The renovation steps were detailed, and precautions during the construction process, such as communication with user departments, multi-department coordination, and emergency plan development, were emphasized.Results The renovation plan effectively resolved the issue of insufficient oxygen system pressure, particularly in the emergency and respiratory wards, ensuring the stability and safety of the oxygen supply.Conclusion When planning and designing oxygen systems, it is essential to consider more influencing factors and extreme usage scenarios to ensure the long-term reliable operation of the system. The importance of communication with relevant departments, multi-department coordination, and the development of emergency plans are emphasized to ensure the smooth execution of the renovation process and to minimize the impact on hospital operations.

    参考文献
    相似文献
    引证文献
引用本文

徐军,魏晓阳,黄碧清.浅谈医院氧气系统提升改造[J].中国医学工程,2024,(6):1-4

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2023-10-07
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-01-13
  • 出版日期:
您是第位访问者
中国医学工程 ® 2025 版权所有
技术支持:北京勤云科技发展有限公司
管理员登录